Civil works and design of road infrastructure.

ADG provided the civil works and design of road infrastructure for Mirvac’s APLNG laydown facility rollout across the Miles QLD area.

APLNG Condabri Central

CIVIL & ENVIRONMENTAL

Miles, QLD

The project was split into 5 stages, each approximately 7 hectares long with major and minor road networks associated.

The geotechnical conditions and lack of site stability presented engineering challenges for us to overcome.

The geotechnical conditions and lack of site stability presented engineering challenges, and the topography of the land, which was very flat made drainage an important issue for management. Each challenge was tackled with due care.

The project was designed and will be a significant milestone for the APLNG project when constructed, ensuring a smooth transition into the operational phase.