Client
Zarplex Constructions Pty Ltd

Year
2016

Value
$5 million

Location
Darwin, Northern Territory

Download PDF

The area was zoned for medium density development, one of the first of its type with limited precedence.

 

The stormwater infrastructure challenges required value engineering solutions in order to make the project viable including the design of a unique discharge arrangement which was adopted for use by the client.

55 Boulter Road, Berrimah

STRUCTURAL / CIVIL & ENVIRONMENTAL / DEVELOPMENT AND CONSTRUCTION

Darwin, Northern Territory

ADG split the catchment so that half of the site discharged to Boulter Road and the other half to the rear of the lot via the uniquely design detention tank underneath the internal road network. This design ensured that the post developed flow rate was not exceeding the pre-development flow.

Alternative civil solutions were design and implemented resulting in significant savings in earthworks and infrastructure costs.