Client
DZine Constructions

Year
2012

Location
Caulfield South, Victoria Australia

Download PDF

Four storey residential project.

The Maple Apartments consisted of a four storey residential project with two levels of basement.

Maple Apartments

STRUCTURAL

Caulfield South, Victoria Australia

The site excavation required a secant pile wall due to a perched water table.
With limited access piling in the base of the excavation was always going to be a difficult proposition.

ADG’s solution was a post tensioned raft, solving the site issues and saving the client in excess of $200,000.