Client
DZine Constructions

Year
2012

Location
Caulfield South, Victoria

Download PDF

The Maple Apartments consisted of a four storey residential building with two levels of basement. The site excavation required a secant pile wall due to a perched water table. With limited access, piling in the base of the excavation was always going to be a difficult proposition. ADG’s solution was a post-tensioned raft, solving the site issues and saving the client in excess of $200,000.

Maple Apartments

STRUCTURAL

Caulfield South, Victoria