FORRESTDALE, WESTERN AUSTRALIA

Western Power Depot

Smart infrastructure supporting WA's energy transition. ADG delivered innovative stormwater solutions and structural efficiencies for Western Power's $50M operational depot, housing 850 employees and 450 vehicles with state-of-the-art electric charging facilities.
Client
ADCO Constructions c/o SPH Architecture & Interiors 
Location
Forrestdale, Western Australia
Sector
Energy and Resources, Infrastructure, Transport
Partner
Western Australian Government, Western Power
Services
Structural, Civil, Infrastructure, Environmental & Sustainability
Project overview

Western Australia’s energy future needed a home. ADG delivered structural and civil engineering for Western Power’s Forrestdale Depot, enabling rapid transformation of WA’s electricity grid.

The $50M facility supports 850 operational staff and 450 vehicles whilst addressing complex site constraints including high water tables and existing service corridors. Through innovative stormwater design and structural optimisation, ADG achieved significant material reductions and cost savings, delivering legacy infrastructure that serves WA’s changing energy needs.

$50
MILLION

CONSTRUCTION VALUE

850
EMPLOYEES

OPERATIONAL & SERVICE EMPLOYEES SUPPORTED

450

HEAVY & LIGHT VEHICLES ACCOMMODATED

With Perth's water table sitting just one metre below ground level, traditional drainage solutions weren't viable. ADG's custom stormwater storage system overcame severe depth restrictions whilst coordinating with existing high-pressure gas corridors, delivering improved drainage performance within constraints that would typically halt construction.

Solving the challenge

Designing for depth

High water tables and restricted site depth demanded fresh thinking for stormwater management.

In Perth, where water typically percolates naturally, a water table sitting just one metre below ground level created unique drainage challenges. ADG devised an innovative stormwater storage system that worked within tight depth constraints whilst coordinating with existing gas corridors and service authorities. The solution rationalised site grating, improved drainage performance and enabled the project to progress on schedule despite fast-tracked timeframes and ongoing design changes.

ADG's Solution

ADG joined ADCO and the Western Australian Government during design development, bringing civil and structural expertise to three main buildings that would house critical operational infrastructure.

From a structural perspective, thorough analysis of steel framing enabled material rationalisation without compromising architectural vision. This delivered measurable cost savings through reduced steel and concrete requirements whilst maintaining design integrity.

The civil engineering solution addressed Perth’s unique conditions head-on. With the water table at approximately one metre below ground level preventing typical percolation, ADG designed an innovative stormwater storage system that worked within severe depth restrictions. This solution coordinated seamlessly with existing gas corridors, rationalised site grating and gained council approval despite challenging site constraints.

Throughout delivery, ADG coordinated with Western Power as service authority, local council, architects and electrical engineers. The team incorporated an existing high-pressure gas system into the design whilst enabling future sustainability features including solar panels and electric vehicle charging infrastructure for the site’s 450 vehicles.

ADG’s peer review and design optimisation improved efficiency across structural and civil components, supporting the rapid transformation of Western Australia’s electricity grid within fast-tracked timeframes.

Stormwater Innovation

Traditional Perth drainage relies on natural percolation, which wasn’t viable with water tables at one metre depth. ADG’s custom storage system overcame depth restrictions whilst coordinating with gas corridors and existing services, delivering improved drainage performance within severe site constraints.

Structural Optimisation

Detailed analysis of structural steel framing identified rationalisation opportunities that reduced material quantities whilst achieving architectural intent. The approach delivered cost savings through concrete and steel reductions, proving that efficiency and design quality work together.

Sustainability Integration

Infrastructure designed for WA’s energy future includes solar panel allowances, EV charging points for 450 vehicles, and material reductions across structural elements. These features position the depot to support evolving energy needs whilst reducing environmental impact.

Have a project in mind?

Let’s start the conversation.

Planning critical infrastructure that powers communities forward?
Local insights designed for Australian conditions.

Meet the team or connect with your local ADG office.

Contact Us
Have a project in mind?

Related Projects

Government, Infrastructure, Industrial, Master Planning and Land Development

Toowoomba Regional Council Principal Depot

ADG delivered innovative civil engineering solutions that slashed construction time and costs for Toowoomba Regional Council's 28-hectare principal depot, creating a modern 5 star NABERS facility consolidating essential infrastructure activities for 500 Council staff across 10 purpose-built buildings.
Read more
EDUCATION & RESIDENTIAL MIXED USE

Campus Perth Student Accommodation

ADG delivered structural and civil engineering for the transformation of an outdated commercial tower into Campus Perth — a vibrant, multi‑level student accommodation hub redefining city living for WA’s next generation